Mass Timber in the Upper Midwest: What We’ve Learned

Mass timber is having a moment, and most of the enthusiasm is earned: it is low-carbon, fast to erect, and genuinely beautiful left exposed. But it rewards an architect who treats it as structure first and finish second.
In a cold, wet climate the details that matter most are the ones you can’t see — moisture management during erection, connection fire-protection, and acoustic separation between floors. Get those right early and the warmth of the material is a gift, not a liability.
On the Mill District Workplace we left the CLT floors exposed throughout. The structure became the architecture, the carbon stayed low, and the building leased on the strength of a ceiling.